Defence Forces - NOC Project

Location

Cork

Client

Defence Forces

Year

2019 - Current

Overview

The Brief

At the end of 2019, CJM entered a competitive tender to refit the Naval Operations Centre at Haulbowline. The facility had not been updated for years, and the Defence Forces required robust, high-performance workstations with full cable management, removable panels for wiring access, ventilation for equipment, and integration for electrical control items. Delivery speed and precision were critical, with a tight timeframe and specific design needs.

Our Solution

CJM’s proposal combined strength, durability, and technical precision. We designed and manufactured three large bespoke console workstations seating nine staff, a slanted standing-height station with under-storage for communications equipment, and multiple low storage units with worktop overhangs. Each workstation was tailored to fit existing infrastructure, including wall pipe allowances. Ergonomic 24-hour operator chairs with advanced adjustability completed the setup. Production drawings were approved quickly, and all furniture was installed within a 2-week turnaround—meeting every functional requirement and earning strong praise from the Defence Forces.

Project Gallery

Scope & Deliverables

Seats: 9
Rooms: Control room with integrated storage
Duration:
2-week turnaround

Services Delivered

Space planning & site surveys
Mock-up samples & control room design
Furniture provision & installation
Made-to-measure desks

Areas Supplied

Control room: 9 pax console workstations
Standing workstation with comms storage
Low 2-door storage units with worktop overhangs
Ergonomic 24-hour operator chairs

Furniture & Finishes

Furniture: Bespoke consoles, standing-height station, and storage units
Seating: High mesh back operator chairs with lumbar support, adjustable headrest, synchro mechanism, and 3D arms
Finishes: Heavy-duty, durable materials for operational environments

Timeline

Tender awarded: Late 2019
Delivery & installation: Completed within 2 weeks of production approval

Need a fit-out for your business?

CJM takes care of every detail - so your space works from day one.